The Bureau of Reclamation has purchased a fleet of 27 electric vehicles from e-Ride Industries of Princeton, MN for the Grand Coulee Dam Project in Washington state. With the addition of 130 new employees over the last two years, the management required more vehicles but also need to meet the federal government’s greenhouse gas emission goals. The electric powered, zero-emission LSVs from e-Ride Industries fit their needs.
e-Ride Industries has already supplied 16 of the 27 vehicles under a total contract for $900,000. The vehicles will be a mixture of the EXV2 Patriot designed for maintenance and utility duties and the EXV4 which can transport up to four people. Both vehicles are ruggedly built for industrial applications, have a top speed of 25 mph and are powered by 72-volt lithium-ion battery packs. The utility version features an enclosed cargo area, 1,000 lb. cargo capacity, built-in toolbox on the outside of the cargo area and a roof rack.
Management expects the fleet of vehicles which will be powered by renewable energy produced by the dam to save 10%-15% in fossil fuel costs, which currently run $111,000 annually. They also expect to save money on vehicle maintenance, and reduce pollution as well. Maintenance on the vehicles requires no disposal of hazardous materials such as used oil, antifreeze, or other liquids associated with gas-powered vehicles. The vehicles are made in America. Learn more: Grandcoulee.com
Comment: Federal and state vehicle fleet mandates continue to be a factor in the electric vehicle market, and the LSV market in particular. While the growing array of options of highway speed electric vehicles may cut into LSV sales moving forward, LSVs will continue to be a viable option for government agencies that need to meet greenhouse gas and emission standards. In particular, applications where utility vehicle versatility and functionality is needed and/or where vehicle travel is in a limited area and at lower speeds, LSVs will remain a cost-effective choice.