{"id":1871,"date":"2011-04-19T07:45:54","date_gmt":"2011-04-19T11:45:54","guid":{"rendered":"http:\/\/smallvehicles.wordpress.com\/?p=1871"},"modified":"2011-04-19T07:45:54","modified_gmt":"2011-04-19T11:45:54","slug":"nev-wins-urban-land-institute-award","status":"publish","type":"post","link":"https:\/\/smallvehicleresource.com\/blog\/2011\/04\/19\/nev-wins-urban-land-institute-award\/","title":{"rendered":"NEV Plan Wins Urban Land Institute Award"},"content":{"rendered":"<p>From the press release:<\/p>\n<blockquote><p><em>A conceptual effort that would allow cities in Riverside County to plan and implement <\/em><em>networks allowing Neighborhood Electric Vehicles (NEVs) has received a ???Vision Award??? from the Orange County\/Inland Empire Chapter of the Urban Land Institute. The ??Western Riverside Council of Governments??? 4-City Neighborhood Electric Vehicle Transportation Plan created potential NEV routes connecting the cities of Corona, Norco, Moreno Valley and Riverside&#8230;.Key components of the plan include a low to no cost Phase One network that leverages??prior infrastructure investments (Class II bike routes) connecting employment, housing??and activity centers. A long range phase is included to provide a complete backbone??network over time. ??<\/em><a title=\"NEV Plan Wins Award\" href=\"http:\/\/www.wrcog.cog.ca.us\/downloads\/NEVULIawardpressrelease041311.pdf\" target=\"_blank\" rel=\"nofollow\">Learn more: ??WRCOG.cog.ca.us (pdf)<\/a>;<\/p>\n<p><a title=\"4-City NEV Plan\" href=\"http:\/\/www.wrcog.cog.ca.us\/downloads\/5.G.1aWRCOG4-CityNEVPlan.pdf\" target=\"_blank\" rel=\"nofollow\">4 City NEV Plan<\/a>(pdf)<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>From the press release: A conceptual effort that would allow cities in Riverside County to plan and implement networks allowing Neighborhood Electric Vehicles (NEVs) has received a ???Vision Award??? from the Orange County\/Inland Empire Chapter of the Urban Land Institute. &hellip; <a href=\"https:\/\/smallvehicleresource.com\/blog\/2011\/04\/19\/nev-wins-urban-land-institute-award\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,10,18,21],"tags":[],"class_list":["post-1871","post","type-post","status-publish","format-standard","hentry","category-electric-vehicles","category-infrastructure","category-nev","category-regulation-policy"],"_links":{"self":[{"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/posts\/1871"}],"collection":[{"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/comments?post=1871"}],"version-history":[{"count":0,"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/posts\/1871\/revisions"}],"wp:attachment":[{"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/media?parent=1871"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/categories?post=1871"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/smallvehicleresource.com\/blog\/wp-json\/wp\/v2\/tags?post=1871"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}